Latent.NYC
City of Yes · ADU check

Can your lot have an ADU?

City of Yes made accessory dwelling units legal with one- and two-family homes across New York: backyard cottages, basement and attic apartments, garage conversions, up to 800 sq ft each. Enter an address to see what the City’s records say about the lot, rule by rule.

NYC

Searches are visible to Latent.NYC and its affiliate Latent Urban Ventures, a real estate advisory and investment business, and may inform advisory, investment, acquisition or other business opportunities. Privacy policy

Where New York's ADUs stand

The City’s review counted on up to 40,000 by 2039. 329 have been filed, and one is finished.

3,540–5,250

by now, if the City's 2039 estimate came in at an even pace

329

filed with DOB since City of Yes, one per lot

110

with a permit

1

finished, with a certificate of occupancy

Filings are picking up. They went from about 6 a month to about 20 after DOB opened a dedicated ADU filing path on September 30, 2025, and now run about 240 a year. That is 9 to 13 percent of the 150–222 a month an even pace to the City’s estimate would take, and 114 of the 329 filings are waiting on objections.

050100150200250Even pace to the City's 2039 estimate: 150–222 a monthDec 2024: 0 filedJan 2025: 2 filedFeb 2025: 3 filedMar 2025: 7 filedApr 2025: 10 filedMay 2025: 10 filedJun 2025: 9 filedJul 2025: 7 filedAug 2025: 4 filedSep 2025: 6 filedOct 2025: 22 filedNov 2025: 15 filedDec 2025: 16 filedJan 2026: 11 filedFeb 2026: 10 filedMar 2026: 26 filedApr 2026: 16 filedMay 2026: 22 filedJun 2026: 25 filedJul 2026: 31 filedAug 2026: 22 filedSep 2026: 18 filedOct 2026: 20 filedNov 2026: 17 filed (month to date)DOB opens its ADU filing pathDec ’24Jun ’25Dec ’25Jun ’26
ADUs filed per month, one per lot · last month to date

What they look like

Not mostly the backyard cottage in the brochures. More than one in four is planned into a brand-new house; basements and additions come next.

  • New house built with an ADU89
  • Basement or cellar74
  • Addition or rebuild71
  • Backyard cottage or garage58
  • Another floor, or not stated28
  • Attic9

Read from each filing’s job description; approximate

Where they are

Queens has 194 and Staten Island 81; Brooklyn 27, the Bronx 26, Manhattan 1. The busiest districts: Queens CD 11 (Bayside) (62), Queens CD 7 (48) and Staten Island CD 3 (South Shore) (42).

Manhattan CD 1: 0 ADUs filedManhattan CD 2: 0 ADUs filedManhattan CD 3: 0 ADUs filedManhattan CD 4: 1 ADU filedManhattan CD 5 (Midtown): 0 ADUs filedManhattan CD 6: 0 ADUs filedManhattan CD 7 (Upper West Side): 0 ADUs filedManhattan CD 8 (Upper East Side): 0 ADUs filedManhattan CD 9: 0 ADUs filedManhattan CD 10: 0 ADUs filedManhattan CD 11: 0 ADUs filedManhattan CD 12: 0 ADUs filedPark or airportBronx CD 1: 0 ADUs filedBronx CD 2: 0 ADUs filedBronx CD 3: 1 ADU filedBronx CD 4: 0 ADUs filedBronx CD 5: 0 ADUs filedBronx CD 6: 1 ADU filedBronx CD 7: 1 ADU filedBronx CD 8: 0 ADUs filedBronx CD 9: 3 ADUs filedBronx CD 10: 6 ADUs filedBronx CD 11: 6 ADUs filedBronx CD 12: 8 ADUs filedPark or airportPark or airportPark or airportBrooklyn CD 1: 0 ADUs filedBrooklyn CD 2: 2 ADUs filedBrooklyn CD 3: 2 ADUs filedBrooklyn CD 4: 1 ADU filedBrooklyn CD 5: 1 ADU filedBrooklyn CD 6: 1 ADU filedBrooklyn CD 7: 2 ADUs filedBrooklyn CD 8: 0 ADUs filedBrooklyn CD 9: 0 ADUs filedBrooklyn CD 10 (Bay Ridge, Dyker Heights): 2 ADUs filedBrooklyn CD 11: 3 ADUs filedBrooklyn CD 12 (Borough Park): 0 ADUs filedBrooklyn CD 13: 0 ADUs filedBrooklyn CD 14: 2 ADUs filedBrooklyn CD 15: 5 ADUs filedBrooklyn CD 16: 0 ADUs filedBrooklyn CD 17: 2 ADUs filedBrooklyn CD 18 (Canarsie, Flatlands): 4 ADUs filedPark or airportPark or airportQueens CD 1: 7 ADUs filedQueens CD 2: 0 ADUs filedQueens CD 3: 7 ADUs filedQueens CD 4 (Corona, Elmhurst): 3 ADUs filedQueens CD 5 (Ridgewood, Maspeth): 6 ADUs filedQueens CD 6: 0 ADUs filedQueens CD 7: 48 ADUs filedQueens CD 8: 11 ADUs filedQueens CD 9: 8 ADUs filedQueens CD 10 (South Ozone Park, Howard Beach): 8 ADUs filedQueens CD 11 (Bayside): 62 ADUs filedQueens CD 12: 7 ADUs filedQueens CD 13 (Queens Village): 26 ADUs filedQueens CD 14: 1 ADU filedPark or airportPark or airportPark or airportPark or airportPark or airportStaten Island CD 1: 21 ADUs filedStaten Island CD 2 (Mid-Island): 18 ADUs filedStaten Island CD 3 (South Shore): 42 ADUs filedPark or airportQN7 · 48QN11 · 62SI3 · 42
ADUs filed1–45–910–2425+noneDistrict outlines: DCP via NYC Open Data

The rules, briefly

Who can add one

Any one- or two-family home: one ADU each, up to 800 sq ft, with no parking space required. When the ADU is first occupied, the lot must be an owner’s primary residence.

Backyard cottages

One story, up to 15 ft, on no more than a third of the required rear yard, 5 ft from the lot lines and 10 ft from the house, with a 5-ft path along the side. Only behind detached and semi-detached houses, and not in historic districts or in R1-2A, R2A and R3A districts beyond the Greater Transit Zone.

Flood risk

No ADU below the flood elevation in FEMA’s 1% annual chance floodplain, and no basement, cellar or backyard ADU in DEP’s rainfall and coastal flood risk areas. None at all in the Special Coastal Risk District.

Two-family houses

An ADU inside one makes a three-family building: a multiple dwelling under State law, with stricter fire rules, and not allowed at all in a frame house. A backyard ADU is a separate building and avoids that.

Rules as read November 24, 2026 from the Zoning Resolution (12-10, 23-341, 23-342, 137-21) and the Building Code’s Appendix U, which also sets basement and cellar rules: 7 ft of clear ceiling height, windows, and a way out in an emergency.

Before you build

  • The City’s ADU for You. HPD and DOB’s ADU for You has the guidebook, a budgeting tool and DOB’s library of pre-approved backyard cottage plans (March 2026).
  • DEP’s flood risk map. Basement, cellar and backyard ADUs are barred in the areas on DEP’s map, which reach well beyond FEMA’s floodplain and aren’t yet published as data we can check for you.
  • Money. The City’s Plus One program offers up to $220,000 in loans and up to $175,000 in State grants (term sheet) to owner-occupants of detached and semi-detached one- and two-family homes earning up to 165% of area median income. Demand has far outrun it: more than 1,300 applications in its first two weeks, and 37 New York City projects in the State’s program. Its latest intake closed June 12, 2026.
  • A survey and an architect. The records here can rule an ADU out; only a survey and a design can rule one in. DOB approves the plans.

How we read it

  • The lot is the City’s tax-lot record (PLUTO): what stands there, its zoning, the lot’s and the house’s width and depth, the basement and garage codes, the historic district, special districts, the transit zone, and FEMA’s effective (2007) and preliminary (2015) flood maps. DEP’s flood risk areas, which the zoning also uses, aren’t public data yet, so the check sends you to DEP’s map.
  • The backyard size is a third of the required rear yard (20 ft deep, or 30 ft behind a semi-detached house on a lot under 40 ft wide) across the lot’s width, capped at 800 sq ft, and shrunk if the records leave too little room behind the house. PLUTO doesn’t record where the house sits, so this is an estimate. Floor area room is the zoning’s residential ceiling less the building’s floor area; the City’s ADU guide counts an ADU as floor area.
  • The citywide count is DOB NOW job filings whose description names an ADU, filed December 5, 2024 through November 23, 2026, with their permits and certificates of occupancy, counted once per lot (several jobs often serve one ADU) and leaving out withdrawn filings and work on existing ADUs. A filing that never says “ADU” is missed.
  • The pace the City assumed is its environmental review’s 27,000 to 40,000 ADUs by 2039 (CEQR 24DCP033Y), spread evenly over 15 years.
  • Not a zoning determination. This is a first read from public records, for owners, builders and lenders sizing up a lot. An architect or engineer confirms what can be built.